Posted by Anup Baral November 22, 2014 :
Water is one of the basic human necessities but a large proportion of the Nepalese population is devoid of access to safe and adequate drinking water.. The major work under this scheme is the construction of Diversion tunnel approximately 26.3 km long excavated by drill and blast method in order to divert 170 MLD of raw water from Melamchi River to Sundarijal outlet where the raw water is treated before sending it to Bulk Distribution System (BDS). The contract for construction of headworks and tunnel was awarded on 19 February 2009 with intended completion date of 2 September 2013. Actual physical works started in April 2010. But due to the unsatisfactory performance of the Contractor it was terminated on 25 September 2012.
Wednesday, October 29, 2014
Popular Posts
-
बाहिर हेर्दा स्वस्थ देखिने मान्छेको मुखबाट दुर्गन्ध निस्किँदा नजिकको मानिसले नराम्रो प्रतिक्रिया दिनु स्वाभाविक पनि हो। अरूले आफूलाई नराम्...
-
Posted by Anup Baral December 29th, 2014 : Article published on newspaper in Nepal. Are these facts about Pushpa Kamal Dahal True or Fals...
-
Posted by Anup Baral October 9th, 2014 : Possession and consumption of marijuana is considered illegal in Thailand. Nepal’s former crown ...